We thought we would add information here on built and proposed wind turbines to have all the details in one place.
Information published here in good faith. If any details are incorrect please let us know.

Trelessy Turbine.
Application just outside Llanteg- this is in the National Park so information is on their website and not on the Pembrokeshire County Council website:

Application NP/13/0216 – received on 15/05/2013
Proposal Erection of single wind turbine (225kw : 44.55m blade tip height : 30m Hub height)
Location Trelessy Farm, Amroth, Narberth, Pembrokeshire, SA67 8PT
SN1785808202
Site Area 0 sq.m
Applicant Mr Lawrence
Agent Mr Matthews
Case Officer Richard James
Current Stage Valid – with Officers
Registered Date 16/07/2013
8 week date 09/09/2013
Level of Decision Delegated

Application just outside Llanteg on road down to Amroth – this is in the National Park so information is on their website and not on the Pembrokeshire County Council website:

Application NP/13/0099 – received on 04/03/2013
Proposal Erection of a single 10kW wind turbine measuring 20m to hub and 23.5m to blade tip.
Location Parsonage Farm, Amroth, Narberth, Pembrokeshire, SA67 8PR
SN1661409095
Site Area 0 sq.m
Applicant Mrs Thompson
Agent Mr Grifiths
Good Life Incorporated
Case Officer Richard James
Current Stage Valid – with Officers
Registered Date 04/03/2013
8 week date 28/04/2013
Level of Decision Delegated
Decision
Withdrawn on 25/04/2013

 

Application No 12/0795/PA – again on the Crosslands Road – full details on the Pembrokeshire Council website
Closing date for objections or support is 27/12/12.

Blaenhafod/Ffynnon Hafod Turbine (granted and built)

Ffynnon Hafod Wind TurbinePlanning Application Ref: 07/1007/PA Validated Date: 30-Oct-2007 Decision Date: 19-Dec-2007 Decision: Conditionally Approved Application Type: Full Applicant: Peter Bignell. Area: Amroth Community Main Location: Ffynon Hafod Full Description: Wind turbine and 2 barns. 18.3m to hub 24.8m to tip of blades. Status: Decision Made.Ffynnon Hafod Wind Turbine

 

 

 

 

 

 

 

 

 

Crunwere House Turbine (granted and built)

Crunwere House Wind Turbine

Planning Application Ref: 10/0958/PA
Validated Date: 14-Jan-2011
Decision Date: 11-Mar-2011
Decision: Conditionally Approved
Application Type: Full
Applicant: Lucia Morgan
Area: Amroth Community Council
Main Location: Land W. of Crunwere House.
Full Description: Erection of a 50Kw Wind Turbine (Amended Description and Amended Plans) – height 24.6 metres radius 9.6 metres, to top 34.3 metres.

 

 

 

 

 

 

Eastlake Anemometer (granted and built)

11/1009/PA
 16-Jan-2012
 Land South of Crosslands Road, Llanteg.
  Erection of a temporary 40.5m anemometer mast.Applicant: James Lawrence
12-Mar-2012
Conditionally Approved
Full  Wind Turbine (Application submitted)
The information regarding the new Turbine application “Land South of Crosslands Road Llanteg” is as follows:
The application number is 12/0604/PA
Submitted to PCC 28/09/12 (PCC date on application form)
Elevation Plans Validated 12/10/12
On PCC website 16/10/12
Closing date for objections is 12/11/12
It is approximately where the current anemometer is (behind Crofty) but 55% taller (anemometer 40m)
It is 62m to top of blades (existing Turbine at Crunwere House is 35m).

 

Trelessy Turbine (refused)
Application –  NP/12/0133  – received on 28/02/2012
Proposal – Erection of single wind turbine with hub height of 48m & total height to tip of blades of 64.7m
Location – Trelessy Farm, Amroth, Narberth, SA67 8PT (SN17860820)
Site Area – 0 sq.m
Applicant – Mr Lawrence
Agent – Mr Morgan MDA Consult Ltd
Case Officer – Liam Jones
Current Stage – Valid – with Officers
Committee Date – 16/05/2012
Determination Date – 14/05/2012
Level of Decision – Committee

 

Turbine Letter & Map – Tenby Observer 6/4/12